Building inspections
Your result updates as you type.
Ask your engineer to check
Want to go further?
See the steps for a new electricity connection.
For works covered by a building permit. The supervising engineer requests an inspector at least 10 days before the expected completion of each stage. Special building uses, buildings constructed at different times and additional energy checks can have separate rules. Fees are not calculated. Confirm the result with your engineer.
Building inspections
Ask your engineer to check
UnverifiedRules last checked
This is an estimate for orientation, not tax or legal advice.
Calculator by greecetools.grFull guide: Building inspections: stages and project category at greecetools.gr